Private Residence·Photos & Progress
Site Feed.
Photos and video from the build, as it happens
This page is not live yet. The five cameras below activate once the site compound is powered, part of the mobilization works, and will then post photos and short video on a regular cadence. The 21 May site visit video is already on the Mobilization page.
Cameras
Five angles, waiting on power.
Connecting…
Front Gate
Connecting…
Pad / Foundation
Connecting…
Rear
Connecting…
Wide / Aerial
Connecting…
Compound
Front Gate and Wide/Aerial are framed on the real D2 site, from the 21 May visit. None of the five are wired yet, power lands with the mobilization works.
The Site Record
What has already happened on site.
- May 2026Site visit: D2 site at Linda Land, Dongdok, walked with the design team. The drawing set reflects what the walk found.
- Week of 4 Jul 2026Septic design active for both buildings: the main house and the in-law suite.
- PendingSite power connection. The five camera angles above go live when power lands.
- NextStage 1 mobilization: site clearing, access, water, surveyor pegs, and permit filing. What mobilization covers.
Want an update on progress? Ask the team directly.
- Emailclients@modernlaohomes.com
- WhatsAppWhatsApp the team
Site status, timing, or anything progress-related.
Replies within working hours (ICT). Off-hours messages are answered first thing.