Portal updated 24 Jul. BOQ with the Lao engineer for sign-off; final plan PDF and first 3D visualisations in production. See activity/ Portal updated 24 Jul. BOQ with the Lao engineer for sign-off; final plan PDF and first 3D visualisations in production. See activity/
Private Residence·Dong Dok Castle

Documents.

10 documents on record 7 files ready to open
All five drawing sets, both agreements, and both paid invoices open right here; save any of them from the viewer. Anything else, message clients@modernlaohomes.com.
Mobilization2 documents
Document Status Date File
Mobilization Agreement, Ref. MLH-CMA-2026-001The advance that puts the team on the land. Signed on 14 Jul 2026; this is the executed copy with the full signing record. Executed 14 Jul 2026 PDF
Mobilization Invoice, MLH-INV-2026-003USD 9,838.10 advance, paid in full 9 Jul 2026 by BCEL transfer, ref MLH-CMA-2026-001. Paid 9 Jul 2026 PDF
Construction7 documents
Document Status Date File
Round 4 drawing set, FinalCorrected closing set (A02–A05). Drawing rounds closed; 3D visualisation in production. Delivered 6 Jul 2026 PDF
Round 3 drawing setFully dimensioned set. Delivered 3 Jul 2026 PDF
Round 2, Option 2, the chosen planThe direction the build follows. Delivered 21 Jun 2026 PDF
Round 2, Option 1, the alternativePresented alongside Option 2. Delivered 21 Jun 2026 PDF
Round 1 drawing setFirst concept drawings. Delivered 15 Jun 2026 PDF
Design BriefYour confirmed design requirements. Complete 13 May 2026 On request
Design Fee RecordUSD 3,000, received in full. Paid 12 May 2026 On request
Design Contract, Ref. MLH.DSN.2026.002Executed copy. E-signed, sealed, and hash-verified. Signed 12 May 2026 PDF
Design Fee Invoice & Receipt, MLH.INV.2026.002USD 3,000, paid in full 12 May 2026 by BCEL transfer. Paid 12 May 2026 PDF
Design ProposalAccepted
Proposal, Dong Dok CastleThe record of scope and indicative pricing. Accepted May 2026